Minicars Inc.

Slide-19L

Mr. Syson began as an engineer in the Structures Group

Mr. Syson was responsible for the structural refinement of the RSV and the entire front energy absorbing section of the LRSV.

Mr. Syson designed the entire roof and floor structure of the Paratransit vehicle

Slide-19R